Installation of a chemical cleaning system for boilers in the main building of the CHPP PVS JSC “AMT”
Installation of a chemical cleaning system for boilers in the main building of the CHPP PVS JSC “AMT”
calendar_today
Scope of work: 1. Deaerator and pump piping2. Earthworks, pouring foundations3. Installation of supporting metal structures4. Installation of the pipeline5. Integration into an existing system6. Installation of instrumentation and control systems7. Hydrotesting, commissioning
Scope of work:
1. Deaerator and pump piping 2. Earthworks, pouring foundations 3. Installation of supporting metal structures 4. Installation of the pipeline 5. Integration into an existing system 6. Installation of instrumentation and control systems 7. Hydrotesting, commissioning