Construction of a plant for copper production using selective extraction and electrolysis

Construction of a plant for copper production using selective extraction and electrolysis
calendar_today

Facility: “Copper production plant” of the Berkarinsky deposit,located in the Algabassky rural district of Semey, East Kazakhstan region Scope of work:— Conducted BIM analysis— Creation of a 3D model from 2D drawings— Modeling of project sections— Identification and resolution of conflicts across all sections— Detection of intersections between utility networks in the project and othersections— […]

Facility: “Copper production plant” of the Berkarinsky deposit,
located in the Algabassky rural district of Semey, East Kazakhstan region

Scope of work:
— Conducted BIM analysis
— Creation of a 3D model from 2D drawings
— Modeling of project sections
— Identification and resolution of conflicts across all sections
— Detection of intersections between utility networks in the project and other
sections
— Implementation of Autodesk BIM 360 software

May be interesting

arrow_forward

Reconstruction of sections 2 and 3 of the Yesil River in Astana, 8 km long

Scope of work: -Dredging the riverbed with a dredger-Bank stabilization with piles and Larsen sheet piles-Construction of hydraulic structures
arrow_forward

Bank protection works along a 4.5 km stretch of the Ural River in the village of Makhambet in the Atyrau region

Scope of work:— Development of design estimates with stateexpert review, using new technologies —ROCK BOX gabion structures, as well asAZ 18-800 sheet piles— Author’s supervision
arrow_forward

Development of design and estimate documentation for the restoration of gas ducts at the Central Heating and Power Plant of JSC AMT

arrow_forward

Modernization of the main building of the Balkhash enrichment plant

-Creation of a 3D information model based on the generatedpoint cloud-Calculation of the KM, KZh structure based on the information model based on theLIRA-SAPR software-Construction of a working model with subsequent generation and issuance of2D working documentation-Construction of a combined 3D model in accordance with the relatedsections provided by the equipment supplier-BIM project support
arrow_forward

Scanning of horizontal underground workings (at a depth of more than 500 m) of JSC Kazakhaltyn Mining and Metallurgical Company, Zholymbet mine

Scope of work: Calculation ofmine workings volumes. Point cloud in .pts format, 3D Meshmodel in .dxf format. Point cloud in .pts format, 3D meshmodel, model volume calculation
arrow_forward

Scanning and 3D modeling of the conductor shaft of the Donskoy Mining and Processing Plant in Khromtau

Work to control the geometric parameters ofthe shaft’s rigid guide conductors and constructa high-precision 3D model of the conductors displaying theiractual geometric parameters, configuration, andlocation along the entire length of the conductor. Point cloud in.pts format, 3D mesh model in .dxf format, shaft cross-sections at4.5 m intervals (1 tier) overlaid on the design data,analysis of […]