Adjustment of the project “Major repairs of the bunkers of the main building of the Zhezkazgan enrichment plants”

Adjustment of the project “Major repairs of the bunkers of the main building of the Zhezkazgan enrichment plants”
calendar_today

Scope of work: • Creation of a 3D information model based on design solutions withintegration of a point cloud, identification and correction of collisions,project adjustments• Restoration and strengthening of metal and reinforced concrete structures, withpartial use of carbon materials• Replacement of lined slabs with polymer ones• Construction and installation works are carried out without stopping […]

Scope of work:

• Creation of a 3D information model based on design solutions with
integration of a point cloud, identification and correction of collisions,
project adjustments
• Restoration and strengthening of metal and reinforced concrete structures, with
partial use of carbon materials
• Replacement of lined slabs with polymer ones
• Construction and installation works are carried out without stopping production

May be interesting

arrow_forward

Reconstruction of sections 2 and 3 of the Yesil River in Astana, 8 km long

Scope of work: -Dredging the riverbed with a dredger-Bank stabilization with piles and Larsen sheet piles-Construction of hydraulic structures
arrow_forward

Bank protection works along a 4.5 km stretch of the Ural River in the village of Makhambet in the Atyrau region

Scope of work:— Development of design estimates with stateexpert review, using new technologies —ROCK BOX gabion structures, as well asAZ 18-800 sheet piles— Author’s supervision
arrow_forward

Development of design and estimate documentation for the restoration of gas ducts at the Central Heating and Power Plant of JSC AMT

arrow_forward

Modernization of the main building of the Balkhash enrichment plant

-Creation of a 3D information model based on the generatedpoint cloud-Calculation of the KM, KZh structure based on the information model based on theLIRA-SAPR software-Construction of a working model with subsequent generation and issuance of2D working documentation-Construction of a combined 3D model in accordance with the relatedsections provided by the equipment supplier-BIM project support
arrow_forward

Scanning of horizontal underground workings (at a depth of more than 500 m) of JSC Kazakhaltyn Mining and Metallurgical Company, Zholymbet mine

Scope of work: Calculation ofmine workings volumes. Point cloud in .pts format, 3D Meshmodel in .dxf format. Point cloud in .pts format, 3D meshmodel, model volume calculation
arrow_forward

Scanning and 3D modeling of the conductor shaft of the Donskoy Mining and Processing Plant in Khromtau

Work to control the geometric parameters ofthe shaft’s rigid guide conductors and constructa high-precision 3D model of the conductors displaying theiractual geometric parameters, configuration, andlocation along the entire length of the conductor. Point cloud in.pts format, 3D mesh model in .dxf format, shaft cross-sections at4.5 m intervals (1 tier) overlaid on the design data,analysis of […]