+7 (717) 263-62-23 — Get in touch. Contacts
+7 (717) 263-62-23 Get in touch

Design

Design
calendar_today

We create accurate, reliable, and fully digital designs for industry, infrastructure, and civil engineering.

Our design solutions are not a collection of drawings, but full-fledged digital models that work on site and in operation. We combine engineering expertise, BIM, and modern analysis methods to create projects that consider risks, installation logic, cost, timeframes, and operational requirements in advance.

Short announcement / subtitle

We design industrial, infrastructure, and civil projects using BIM, laser scanning, computational systems, and digital twins. This allows us to identify errors before construction, optimize costs and timelines, expedite approvals, and ensure perfect compliance with design documentation.


What we design

Industrial facilities

Metallurgy, energy, processing, chemistry, water treatment, factories, RTO, utility networks.

Infrastructure and hydraulic engineering

Bridges, logistics hubs, transport schemes, hydraulic structures, coastal protection.

Civil Engineering

Schools, kindergartens, residential complexes, sports and social facilities.

Unique and high-precision objects

Rocket and space industry, heavy engineering complexes, mine shafts, underground workings.


Our approach to design

1) Design based on data, not assumptions

Every project begins with the collection of accurate information—drawings, standards, specifications, surveys, and laser scanning. Instead of outdated data, we use real geometric models—point clouds, drones, measurements, and monitoring.

2) A complete digital model (BIM) is the core of the entire project

We create not a picture, but a digital twin (LOD 200–400), in which:

— precise geometry
— materials and characteristics
— utility networks
— equipment
— cost (5D)
— terms (4D)
— operation (6D)

This ensures absolute precision and avoids rework.

3) Integration of engineering calculations into the model

We perform calculations in LIRA-SAPR, combining them with a BIM model:

— static and dynamic calculations
— checking of nodes
— searching for critical rods
— load analysis
— visualization of calculation results

As a result, the project is not just beautiful – it works under load.

4) Identification and elimination of conflicts before construction

We check for intersections between:

— sections of the AS/KZ/KM/TH/KIPiA/OV/VK/ES
— engineering networks
— equipment
— the old and new parts of the facility (during reconstruction)

Before going to site, the customer receives the project without any conflicts.

5) Documentation that is fully related to the model

Drawings, specifications, statements, and calculations are all generated automatically from the model.
This eliminates errors, speeds up approvals, and makes the project transparent.

6) Project support and author’s supervision

We manage the model from start to construction and beyond, providing monitoring, updates, consultations, and technical supervision.


Why our design is more reliable than the classic one

Accuracy

Laser scanning, point clouds, surveying, VR surveys, drones.
No “approximately so,” just the facts.

Speed

BIM processes reduce the time required for approvals and estimate recalculations significantly.

Saving

Automatic volumes, 5D costing, clash detection → less rework → lower budget.

Transparency

The customer sees the model, graphs, risks and alternatives.

Reliability

The model is easily put into operation as a digital passport of the object.

How we work

  • Collection of initial data and technical specifications

    Our engineers review drawings, plans, standards, and the client's requests. We determine the project's objectives, scope of work, BIM requirements, and levels of detail. We then create the foundation for the future digital model.

  • Examination and laser scanning

    A team of specialists visits the site. We perform 3D laser scanning, aerial photography, and structural inspection. We create a point cloud and verify the actual data against the documentation.

  • Data processing and 3D model construction

    The point cloud is cleaned, aligned, and georeferenced. Based on this data, we create precise geometry, equipment, and utility systems. We perform collision analysis and node refinement.

  • Development of a comprehensive BIM model (3D/4D/5D)

    We create a complete digital twin. We link construction timelines (4D) and costs (5D) to the model. We also create a logical structure for the facility.

  • Engineering calculations and verification of solutions

    We integrate the model into LIRA-SAPR. We perform static and dynamic calculations, check joints, loads, and deformations, and make adjustments to the design.

  • Preparation of design documentation

    We generate drawings, specifications, bills of quantities, estimates, and explanatory notes. All documents are linked to the model and are error-free.

  • Approvals and examinations

    We prepare the package for examination, support the process, correct any discrepancies, and ensure a complete review.

  • Project handover and author's supervision

    We deliver the complete BIM model and documentation. We provide support, consultations, and implementation oversight.

How we work

Our services are based on modern digital construction management methods. We use BIM models, precise planning, and automated calculations to ensure projects are transparent, manageable, and predictable at all stages—from design to commissioning.

We use BIM

We work with digital information models of buildings that combine geometry, engineering, construction logic, and site data. This allows us to identify errors early, coordinate solutions faster, and manage the project at all stages.

Construction schedule

We create a realistic work schedule that takes into account construction technology, logistics, contractors, and resources. This plan helps manage deadlines, avoid downtime, and understand the project's current status at any given moment.

Full construction support

We support projects from design to implementation: we consult, make changes, answer contractor questions, and assist with decision-making throughout construction. The project doesn't remain "on paper"—we stay involved in the process.

Automatic calculation of the volume of work

We obtain work volumes and specifications directly from the BIM model. This reduces errors, speeds up calculations, and enables accurate planning of estimates, procurement, and execution.

May be interesting

arrow_forward

BIM 3D project implementation

We create precise 3D building models with a complete set of data on elements, materials, and engineering systems. BIM 3D allows you to visualize the project before construction, reduce errors, and speed up design.
arrow_forward

BIM 4D project implementation

4D BIM adds a time factor to the 3D model. This allows for a detailed month-by-month view of the project's construction, identifying risks, optimizing workflows, and avoiding delays. This approach makes design more accurate, and construction more predictable and manageable.
arrow_forward

BIM 5D project implementation

This is the process of creating a building project that includes, in addition to information about the position of the object's elements in space (3D) and time (4D), any other quantifiable characteristic, such as cost (5D)
arrow_forward

Construction schedule

A schedule is the foundation of a managed construction project: it shows what is being done, when, and by whom. Our approach eliminates guesswork, eliminates overlapping crews, and allows for early identification of risks and optimized timelines.
arrow_forward

Laser scanning

We capture the object as it exists in reality. This eliminates errors, saves designers' time, and prevents collisions before they arise on the construction site.
arrow_forward

Collision detection

We uncover things that aren't visible in standard drawings: structural intersections, engineering errors, incorrect element dependencies, and timing conflicts. This saves the client months and millions.

Projects

View all
The Paralympic complex

In the sports complex with an area of 4,149 square meters. m there is a gym, games room, martial arts room, medical unit, locker rooms and a small number of rooms.

Astana
Paralympic complex of Kazakhstan
Southwest bypass of Astana

The last part of the Big Ring — the 34-kilometer Southwest bypass of Astana was built for two years and has three bridges and four interchanges.

Astana
Goverment of Astana
Zhairem Mining and Concentrating Complex

Warehouses of potent toxic substances at Zhairem Mining and Concentrating Complex.

Kazakhstan
Kazzinc
Baiterek space launch complex

Based on a new-generation medium-class space rocket for launching unmanned spacecraft.

Baikonur
TsENKI
Reconstruction of a section of the Yesil River

Dredging of the river bed, strengthening of the bank with piles, construction of hydraulic structures

Astana
Goverment of Astana

Our Divisions

Residential Real Estate

We design and build modern, comfortable, and sustainable living spaces — from premium residential complexes to individual housing projects. Every development combines architectural excellence with functionality to create homes people love.

Retail Development

Our retail projects provide functional, attractive spaces that help businesses thrive. From shopping malls to boutique stores, we deliver environments that balance aesthetics, convenience, and commercial efficiency.

Commercial & Public Buildings

We develop office centers, business hubs, and public facilities that meet the highest standards of quality, safety, and efficiency — supporting both economic growth and community needs.

Infrastructure Projects

From roads to utility systems, we take on infrastructure projects that form the backbone of thriving cities. Our approach ensures durability, cost-effectiveness, and seamless integration with the surrounding environment.

BIM Technology

We implement advanced Building Information Modeling (BIM) to optimize design, construction, and facility management. This technology allows precise planning, reduces errors, and increases project efficiency.

Testimonials

LLP "En-Bereke" in 2019 as part of the contract for 3D modeling of objects Construction "JSC ХГОК Polymetallic Zhairema. Modernization of the current производства" with the application of V1M-technologies, the modeling was carried out the most technologically complex systems of the future factory: thermal, external technological networks water pipelines, slurry pipelines, acid water bypasses, aspiration systems, air supply, technological communications and water supply, and other sections. The obtained information model of construction workshops is our field opportunity general contracting organizations to significantly speed up the installation of the pipeline system, clarify volume and specification of pipe production for placing applications during their manufacture. In addition, the company "En Bereke" identified collisions in the project, which were eliminated contributed to a significant reduction in project implementation terms. It is necessary to note that the works under the contract were completed 1 month early. At the same time, the company "En Bereke" has established itself as a professional team. possessing the skills of modern digital design and complex modeling industrial facilities. The created BM model is designed with use at the stage of construction was transferred to the exploiting subdivisions of ХГОК ​​and, possibly, will be used for creation of a digital double combine. In addition, the obtained results became the basis for continued cooperation "En Bereke" LLP. In particular, a new contract was concluded in February 2020 "Correction of the design and estimate documentation stage of the construction of the main "RD". POF housing in parts, laying reagent pipes and 3ZO-modeling of the main housing POF". Thus, the management of "Kazzinc" LLP recommends GOO "En Bereke" as a quality A reliable partner in the field of modern design of complex industrial facilities using VM technologies, as well as as a company providing VM — consulting services.

— E. L. Kalmykov, Head of the Project Implementation Department

Since 2017, our company has been cooperating with the company "En-Bereke" in the field design of restaurant networks KES, COSTA COFFEE, Hardees. For this time, the company has established itself as reliable highly qualified partner. "En-Bereke" employees are experienced Designers flexibly and quickly respond to the wishes of clients. The projects implemented are of high quality and fully correspond to ours corporate standards, which is positively reflected in the terms construction works of our facilities. In this regard, we can recommend "En-Bereke" LLP as a professional company project company.

— A. Sotnikov, Director of Construction

Since May 2020, PTRSO (En-Bersks) has been providing virtual modeling support for the design of a processing plant with a production capacity of 4 million tons of ore per year at the Shalkiya deposit. In a very short time, the company quickly set up work in the B1M 360 Ros$ cloud environment, which enabled clear communication between the design team members, experts, and the client's design team. The master plan and main production buildings of the plant were quickly modeled, and work to identify and resolve conflicts in the design was systematically implemented. The company is also actively participating in the development and implementation of the "Digital Twin of the Plant" concept. It is also worth noting that PTRSO organized distance learning for the entire project team on the basics of B1M modeling, specifically related to our project. Overall, I believe ORSO LLC has significant expertise in industrial design using modern B1M technologies. Therefore, I can recommend this company as a reliable and professional partner.

— M.O. Dzhakishev, Project Manager

With this letter, I, the director of TOKYO ROUP ALMATY, confirm that En-Bereke is our long-standing business partner.
Since 2018, we have collaborated on various projects, including "Bank protection works along a 4.5-kilometer stretch of the Ural River in the village of Makhambet, Makhambetsky District, Atyrau Region." This project was completed at a professional level and received a positive conclusion from the State Expert Review.
I confidently recommend this company as a reliable partner in the design field.

— Takeyama Toshio, General Director

Dear Sofia Nikolaevna! The National Paralympic Committee of Kazakhstan expresses its sincere gratitude for the opportunity to work in a cozy, comfortable, and modern office. The atmosphere of the new office has served as an excellent motivator for all of our team members, who are redoubled in their enthusiasm for developing domestic Paralympic sport. We wish you success in your endeavors, professional growth, financial stability, and reliable partners.

— E. Suleimenov, Executive Director of the Scientific and Production Complex

Certificates

The best digital solution
for GMK
AMM Congress
Certificate for the right to carry out work in the field of safety
Certificate
State license for construction works
State license
Certificate of Conformity
Certificate of Conformity