+7 (717) 263-62-23 — Get in touch. Contacts
+7 (717) 263-62-23 Get in touch

Laser scanning

Laser scanning
calendar_today

We capture the object as it exists in reality. This eliminates errors, saves designers' time, and prevents collisions before they arise on the construction site.

Accurate digital site surveying for design, reconstruction, and construction supervision

3D laser scanning is a fast and highly accurate way to capture the actual geometry of a building, site, or utility systems . The result is a dense point cloud that reflects the object in its real state with millimeter accuracy.
This data becomes a reliable basis for design, BIM modeling, reconstruction, and technical inspection.

Why is laser scanning necessary?

1. Precise geometry without manual measurements.
No engineer with a tape measure can provide this level of detail. A laser captures everything: dimensions, deformations, deviations, and hidden areas.

2. An up-to-date basis for the BIM model.
The point cloud is transformed into a correct 3D model, which accurately supports the architecture, structure, and engineering systems.

3. Inspection of existing structures before reconstruction.
You can see in advance any discrepancies with the design, problem areas, and the condition of load-bearing elements.

4. Comparison of the construction site with the project.
Scanning “stage by stage” allows for the identification of deviations, installation errors, and technology violations.

5. Accelerate approvals and assessments.
Actual geometry eliminates ambiguity—all participants work with verified data.


How we work

1. Survey of the object

We travel to the site, select equipment installation locations, and perform a full scan of the building, grounds, or utility systems.

2. Data processing

We create a single point cloud, remove noise, combine scans, and set coordinates and references.

3. Issuing the model and reports

We provide the client with a point cloud, 3D model, cross-sections, sections, thermal deviation maps, or fully prepared material for BIM design.


What does the customer receive?

— precise object measurements with millimeter accuracy;
— a ready-made basis for a BIM model and design documentation;
— minimizing the risk of errors, rework, and conflicts on the construction site;
— the ability to control geometry at any stage of construction;
— expedited inspections, reconstruction, and expert assessments.

How we work

Our services are based on modern digital construction management methods. We use BIM models, precise planning, and automated calculations to ensure projects are transparent, manageable, and predictable at all stages—from design to commissioning.

We use BIM

We work with digital information models of buildings that combine geometry, engineering, construction logic, and site data. This allows us to identify errors early, coordinate solutions faster, and manage the project at all stages.

Construction schedule

We create a realistic work schedule that takes into account construction technology, logistics, contractors, and resources. This plan helps manage deadlines, avoid downtime, and understand the project's current status at any given moment.

Full construction support

We support projects from design to implementation: we consult, make changes, answer contractor questions, and assist with decision-making throughout construction. The project doesn't remain "on paper"—we stay involved in the process.

Automatic calculation of the volume of work

We obtain work volumes and specifications directly from the BIM model. This reduces errors, speeds up calculations, and enables accurate planning of estimates, procurement, and execution.

May be interesting

Projects

View all
The Paralympic complex

In the sports complex with an area of 4,149 square meters. m there is a gym, games room, martial arts room, medical unit, locker rooms and a small number of rooms.

Astana
Paralympic complex of Kazakhstan
Southwest bypass of Astana

The last part of the Big Ring — the 34-kilometer Southwest bypass of Astana was built for two years and has three bridges and four interchanges.

Astana
Goverment of Astana
Zhairem Mining and Concentrating Complex

Warehouses of potent toxic substances at Zhairem Mining and Concentrating Complex.

Kazakhstan
Kazzinc
Baiterek space launch complex

Based on a new-generation medium-class space rocket for launching unmanned spacecraft.

Baikonur
TsENKI
Reconstruction of a section of the Yesil River

Dredging of the river bed, strengthening of the bank with piles, construction of hydraulic structures

Astana
Goverment of Astana

Our Divisions

Residential Real Estate

We design and build modern, comfortable, and sustainable living spaces — from premium residential complexes to individual housing projects. Every development combines architectural excellence with functionality to create homes people love.

Retail Development

Our retail projects provide functional, attractive spaces that help businesses thrive. From shopping malls to boutique stores, we deliver environments that balance aesthetics, convenience, and commercial efficiency.

Commercial & Public Buildings

We develop office centers, business hubs, and public facilities that meet the highest standards of quality, safety, and efficiency — supporting both economic growth and community needs.

Infrastructure Projects

From roads to utility systems, we take on infrastructure projects that form the backbone of thriving cities. Our approach ensures durability, cost-effectiveness, and seamless integration with the surrounding environment.

BIM Technology

We implement advanced Building Information Modeling (BIM) to optimize design, construction, and facility management. This technology allows precise planning, reduces errors, and increases project efficiency.

Testimonials

LLP "En-Bereke" in 2019 as part of the contract for 3D modeling of objects Construction "JSC ХГОК Polymetallic Zhairema. Modernization of the current производства" with the application of V1M-technologies, the modeling was carried out the most technologically complex systems of the future factory: thermal, external technological networks water pipelines, slurry pipelines, acid water bypasses, aspiration systems, air supply, technological communications and water supply, and other sections. The obtained information model of construction workshops is our field opportunity general contracting organizations to significantly speed up the installation of the pipeline system, clarify volume and specification of pipe production for placing applications during their manufacture. In addition, the company "En Bereke" identified collisions in the project, which were eliminated contributed to a significant reduction in project implementation terms. It is necessary to note that the works under the contract were completed 1 month early. At the same time, the company "En Bereke" has established itself as a professional team. possessing the skills of modern digital design and complex modeling industrial facilities. The created BM model is designed with use at the stage of construction was transferred to the exploiting subdivisions of ХГОК ​​and, possibly, will be used for creation of a digital double combine. In addition, the obtained results became the basis for continued cooperation "En Bereke" LLP. In particular, a new contract was concluded in February 2020 "Correction of the design and estimate documentation stage of the construction of the main "RD". POF housing in parts, laying reagent pipes and 3ZO-modeling of the main housing POF". Thus, the management of "Kazzinc" LLP recommends GOO "En Bereke" as a quality A reliable partner in the field of modern design of complex industrial facilities using VM technologies, as well as as a company providing VM — consulting services.

— E. L. Kalmykov, Head of the Project Implementation Department

Since 2017, our company has been cooperating with the company "En-Bereke" in the field design of restaurant networks KES, COSTA COFFEE, Hardees. For this time, the company has established itself as reliable highly qualified partner. "En-Bereke" employees are experienced Designers flexibly and quickly respond to the wishes of clients. The projects implemented are of high quality and fully correspond to ours corporate standards, which is positively reflected in the terms construction works of our facilities. In this regard, we can recommend "En-Bereke" LLP as a professional company project company.

— A. Sotnikov, Director of Construction

Since May 2020, PTRSO (En-Bersks) has been providing virtual modeling support for the design of a processing plant with a production capacity of 4 million tons of ore per year at the Shalkiya deposit. In a very short time, the company quickly set up work in the B1M 360 Ros$ cloud environment, which enabled clear communication between the design team members, experts, and the client's design team. The master plan and main production buildings of the plant were quickly modeled, and work to identify and resolve conflicts in the design was systematically implemented. The company is also actively participating in the development and implementation of the "Digital Twin of the Plant" concept. It is also worth noting that PTRSO organized distance learning for the entire project team on the basics of B1M modeling, specifically related to our project. Overall, I believe ORSO LLC has significant expertise in industrial design using modern B1M technologies. Therefore, I can recommend this company as a reliable and professional partner.

— M.O. Dzhakishev, Project Manager

With this letter, I, the director of TOKYO ROUP ALMATY, confirm that En-Bereke is our long-standing business partner.
Since 2018, we have collaborated on various projects, including "Bank protection works along a 4.5-kilometer stretch of the Ural River in the village of Makhambet, Makhambetsky District, Atyrau Region." This project was completed at a professional level and received a positive conclusion from the State Expert Review.
I confidently recommend this company as a reliable partner in the design field.

— Takeyama Toshio, General Director

Dear Sofia Nikolaevna! The National Paralympic Committee of Kazakhstan expresses its sincere gratitude for the opportunity to work in a cozy, comfortable, and modern office. The atmosphere of the new office has served as an excellent motivator for all of our team members, who are redoubled in their enthusiasm for developing domestic Paralympic sport. We wish you success in your endeavors, professional growth, financial stability, and reliable partners.

— E. Suleimenov, Executive Director of the Scientific and Production Complex

Certificates

The best digital solution
for GMK
AMM Congress
Certificate for the right to carry out work in the field of safety
Certificate
State license for construction works
State license
Certificate of Conformity
Certificate of Conformity