Projects
arrow_forward
Creation of the Baiterek space rocket complex
Based on a new-generation medium-class space rocket for launching unmanned spacecraft. Project modeling and adjustments, modernization of pads 45 and 42, and construction of a dedicated railway line.
arrow_forward
Design and installation of a chemical cleaning system for boiler No. 7 at TPP 2 of Qarmet JSC
arrow_forward
Reconstruction of the cooling chamber of the continuous casting machine 1 of the AMT KKTs
Scaffolding installation; Rust converter treatment of metal structures up to 5 times; Installation of new metal structures; Mechanical (manual) cleaning of metal structures; Removal of industrial oils from metal structures; Removal of old paint from metal structures using a special compound; Reinforcement of columns with metal structures; Painting of metal structures
arrow_forward
Restoration of the AMT aeration lantern
Scope of work: 1. Development of a detailed design 2. Cleaning of industrial waste 3. Temporary re-support of damaged structures 4. Restoration of roof slabs 5. Dismantling of shutters, fencing, damaged metal structures, etc. 6. Treatment of metal structures with a rust converter up to 5 times 7. Installation of new metal structures 8. Mechanical (manual) cleaning of metal structures 9. Reinforcement of metal trusses with structures 10. Painting of metal structures
arrow_forward
Restoration of battery emulsifiers of the main building of the AMT Boiler Shop
Scope of work: 1. Development of design solutions2. Dismantling the shell, transition cone and cone3. Manufacturing and installation of emulsifier parts4. Mechanical (manual) cleaning of metal structures5. Treatment of metal structures with a rust converter6. Application of silicate solution7. Lining with acid-resistant tiles (ceramic)8. Painting of metal structures (external)
arrow_forward
Restoration of damaged carbon roof slabs at the AMT Thermal Power Plant
Scope of work: 1. Development of design solutions and POR2. Preparation of sites for work3. Dust removal from surfaces, jointing and surface grinding4. Anti-corrosion treatment of exposed reinforcement5. Application of a restorative layer with a special solution such as Emako6. Covering the slab with CarbonWrap tape7. Final painting of reinforcement areas
arrow_forward
Installation of a chemical cleaning system for boilers in the main building of the CHPP PVS JSC “AMT”
Scope of work: 1. Deaerator and pump piping2. Earthworks, pouring foundations3. Installation of supporting metal structures4. Installation of the pipeline5. Integration into an existing system6. Installation of instrumentation and control systems7. Hydrotesting, commissioning
arrow_forward
Installation of a plastic flue gas duct for boiler 1.2 of the Thermal Power Plant of JSC AMT
Scope of work: 1. Development of KMD and POR2. Earthworks, pouring foundations3. Installation of metal structures4. Installation of the flue gas duct5. Insertion into the existing exhaust system Final painting of thereinforcement areas
arrow_forward