Projects

arrow_forward

Creation of the Baiterek space rocket complex

Based on a new-generation medium-class space rocket for launching unmanned spacecraft. Project modeling and adjustments, modernization of pads 45 and 42, and construction of a dedicated railway line.
arrow_forward

Design and installation of a chemical cleaning system for boiler No. 7 at TPP 2 of Qarmet JSC

arrow_forward

Reconstruction of the cooling chamber of the continuous casting machine 1 of the AMT KKTs

Scaffolding installation; Rust converter treatment of metal structures up to 5 times; Installation of new metal structures; Mechanical (manual) cleaning of metal structures; Removal of industrial oils from metal structures; Removal of old paint from metal structures using a special compound; Reinforcement of columns with metal structures; Painting of metal structures
arrow_forward

Restoration of the AMT aeration lantern

Scope of work: 1. Development of a detailed design 2. Cleaning of industrial waste 3. Temporary re-support of damaged structures 4. Restoration of roof slabs 5. Dismantling of shutters, fencing, damaged metal structures, etc. 6. Treatment of metal structures with a rust converter up to 5 times 7. Installation of new metal structures 8. Mechanical (manual) cleaning of metal structures 9. Reinforcement of metal trusses with structures 10. Painting of metal structures
arrow_forward

Restoration of battery emulsifiers of the main building of the AMT Boiler Shop

Scope of work: 1. Development of design solutions2. Dismantling the shell, transition cone and cone3. Manufacturing and installation of emulsifier parts4. Mechanical (manual) cleaning of metal structures5. Treatment of metal structures with a rust converter6. Application of silicate solution7. Lining with acid-resistant tiles (ceramic)8. Painting of metal structures (external)
arrow_forward

Restoration of damaged carbon roof slabs at the AMT Thermal Power Plant

Scope of work: 1. Development of design solutions and POR2. Preparation of sites for work3. Dust removal from surfaces, jointing and surface grinding4. Anti-corrosion treatment of exposed reinforcement5. Application of a restorative layer with a special solution such as Emako6. Covering the slab with CarbonWrap tape7. Final painting of reinforcement areas
arrow_forward

Installation of a chemical cleaning system for boilers in the main building of the CHPP PVS JSC “AMT”

Scope of work: 1. Deaerator and pump piping2. Earthworks, pouring foundations3. Installation of supporting metal structures4. Installation of the pipeline5. Integration into an existing system6. Installation of instrumentation and control systems7. Hydrotesting, commissioning
arrow_forward

Installation of a plastic flue gas duct for boiler 1.2 of the Thermal Power Plant of JSC AMT

Scope of work: 1. Development of KMD and POR2. Earthworks, pouring foundations3. Installation of metal structures4. Installation of the flue gas duct5. Insertion into the existing exhaust system Final painting of thereinforcement areas
arrow_forward

BIM design and construction support for the Shalkiya mining and processing plant

Scope of work: -BIM support for design at the “P” and “RD” stages, includingthe creation of a 3D model (LOD 200 at the “Project” stage and LOD 400 at the “Workingdocumentation” stage)— identification of collisions, followed by adjustment of the model— providing automated calculation of work volumes to determinethe estimated cost of construction— implementation and […]